mirror of
https://github.com/asterisk/asterisk.git
synced 2025-09-03 19:28:53 +00:00
main/cdr: Use 'time' when rescheduling batched CDRs as opposed to 'size'
When refactoring CDRs to use the configuration framework, a 'whoops' was introduced where the CDR batch size was used when rescheduling a batch, as opposed to the time duration. This patch corrects that obvious mistake. ASTERISK-24426 #close Reported by: Shane Blaser ........ Merged revisions 425735 from http://svn.asterisk.org/svn/asterisk/branches/12 git-svn-id: https://origsvn.digium.com/svn/asterisk/branches/13@425736 65c4cc65-6c06-0410-ace0-fbb531ad65f3
This commit is contained in:
@@ -3520,7 +3520,7 @@ static int submit_scheduled_batch(const void *data)
|
||||
/* manually reschedule from this point in time */
|
||||
|
||||
ast_mutex_lock(&cdr_sched_lock);
|
||||
cdr_sched = ast_sched_add(sched, mod_cfg->general->batch_settings.size * 1000, submit_scheduled_batch, NULL);
|
||||
cdr_sched = ast_sched_add(sched, mod_cfg->general->batch_settings.time * 1000, submit_scheduled_batch, NULL);
|
||||
ast_mutex_unlock(&cdr_sched_lock);
|
||||
/* returning zero so the scheduler does not automatically reschedule */
|
||||
return 0;
|
||||
|
Reference in New Issue
Block a user